下列关于项目管理计划错误是( )。

  • A.高层管理人员为了加快解决未解决问题和处理未做出决策,对范围、时间、成本和质量安排关键审查。
  • B.监控变更方式、方法和实施配置管理方式、方法,使用实施效果测量基准并使之保持完整方式、方法
  • C.为了实现项目目标所执行工作方式、方法。选定过程实施水平,并对使用工具与技术所做说明
  • D.项目管理团队选择各个项目管理过程,选定项目生命期和多阶段项目项目阶段

正确答案及解析

正确答案
A
解析

高层管理人员为了加快解决未解决问题和处理未做出决策,对内容、范围和时间安排关键审查。

你可能感兴趣的试题

问答题

Anetwork attack is an attempt to gain(71)access to an organization’s network,with the objective of stealing data or performing other malicious activities.Plagiarism is A(72)-of-service(DoS)attack is a cyber-attack in which the attacker seeks to make a machine or network resource unavailable to its intended users by temporarily or indefinitely disrupting services of a host connected to a network.In the case of a simple attack,a(73)could have a simple rule added to deny all incoming traffic from the attackers,based on protocols,ports,or the originating IP addresses.In a(74)DoS(DDoS)attack wangwangwang,the incoming traffic flooding the victim originates from(75)different sources.This effectively makes it impossible to stop the attack simply by blocking a single source 问题1:

A.unauthorized

B.authorized

C.normal

D.frequent

问题2:

A.defense

B.denial

C.detection

D.decision

问题3:

A.firewall

B.router

C.gateway

D.switch

问题4:

Adamaged

B.descriptive

C.distributed

D.demanding

问题5:

A.two

B.many

C.much

D.ten

查看答案
单选题

以下关于信息化项目成本估算的描述中,不正确的是( )。

  • A.项目成本估算指设备采购、劳务支出等直接用于项目建设的经费估算
  • B.项目成本估算需考虑项目工期要求的影响,工期要求越短成本越高
  • C.项目成本估算需考虑项目质量要求的影响,质量要求越高成本越高
  • D.项目成本估算过粗或过细都会影响项目成本
查看答案
单选题

《中华人民共和国数据安全法》由中华人民共和国第十三届全国人民代表大会常务委员会第二十九次会议审议通过,自( )年 9 月 1 日起施行。

  • A.2019
  • B.2020
  • C.2021
  • D.2022
查看答案
单选题

某存储系统规划配置 25 块 8TB 磁盘,创建 2 个 RAID6 组,配置 1 块热备盘,则该存储系统实际存储容量是( )。

  • A.200T
  • B.192TB
  • C.176TB
  • D.160TB
查看答案
单选题

以下关于层次化网络设计模型的描述中,不正确的是( )。

  • A.终端用户网关通常部署在核心层,实现不同区域间的数据高速转发
  • B.流量负载和 VLAN 间路由在汇聚层实现
  • C.MAC 地址过滤、路由发现在接入层实现
  • D.接入层连接无线 AP 等终端设备
查看答案

相关题库更多 +