With circuit switching,a(  )path is established between two stations for communication.Switching and transmission resources within the network are(  )for the exclusive use of the circuit for the duration of the connection.The connection is(  ):Once it is established,it appears to attached devices as if there were a direct connection.Packet switching was designed to provide a more efficient facility than circuit switching for(  )data traffic.Each packet contains some portion of the user data plus control information needed for proper functioning of the network.A key distinguishing element of packet-switching networks is whether the internal operation is datagram or virtual circuit.With internal virtual circuits,a route is defined between two endpoints and all packets for that virtual circuit follow the(  )route,With internal datagrams,each packet is treated independently,and packets intended for the same destination may follow different routes.
问题1选项
A.unique
B.dedicated
C.nondedicated
D.independent
问题2选项
A.discarded
B.abandoned
C.reserved
D.broken
问题3选项
A.indistinct
B.direct
C.indirect
D.transparent
问题4选项
A.casual
B.bursty
C.limited
D.abundant
问题5选项
A.same
B.different
C.single
D.multiple
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
- 
                
- A.Artificial Intelligence
 - B.Cloud Computing
 - C.Internet of Things
 - D.Big Data
 
 - 查看答案
 
In project human resource management , ( )is not a source of power for the project manager.
- 
                
- A.referent power
 - B.expert power
 - C.reward power
 - D.audit power
 
 - 查看答案
 
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
- 
                
- A.detail feasibility analysis
 - B.opportunity analysis
 - C.economic feasibility analysis
 - D.risk analysis
 
 - 查看答案
 
( )is a grid that shows the project resources assigned to each work package.
- 
                
- A.Stakeholder engagement assessment matrix
 - B.Requirements traceability matrix
 - C.Probability and impact matrix
 - D.Responsibility assignment matrix
 
 - 查看答案
 
Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.
- 
                
- A.digital
 - B.networking
 - C.intelligentize
 - D.informatization
 
 - 查看答案