某班级学生《C++程序设计》成绩表如下图所示。若学生作业成绩、上机成绩和笔试成绩分别占综合成绩的15%、25%和60%,那么可先在E3单元格中输入( ),再向垂直方向拖动填充柄至E10单元格,则可自动算出这些学生的综合成绩。若要将及格和不及格的人数统计结果显示在B11和E11单元格中,则应在B11和E11中分别填写( )。
问题1选项
A.=B3*15%+C3*25%+D3*60%
B.=_B$3*15%+C$3*25%+D$3*60%
C.=SUM(B3*15%+C3*25%+D3*60%)
D.=SUM(B$3*15%+C$3*25%+D$3*60%)
问题2选项
A.=COUNT(E3:E10,>=60)和=COUNT(E3:E10,<60)
B.=COUNT(E3:E10,">=60")和=COUNT(E3:E10,"<60")
C.=COUNTIF(E3:E10,>=60)和=COUNTIF(E3:E10,<60)
D.=COUNTIF(E3:E10,">=60")和=COUNTIF(E3:E10,"<60")
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
-
- A.Artificial Intelligence
- B.Cloud Computing
- C.Internet of Things
- D.Big Data
- 查看答案
In project human resource management , ( )is not a source of power for the project manager.
-
- A.referent power
- B.expert power
- C.reward power
- D.audit power
- 查看答案
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
-
- A.detail feasibility analysis
- B.opportunity analysis
- C.economic feasibility analysis
- D.risk analysis
- 查看答案
( )is a grid that shows the project resources assigned to each work package.
-
- A.Stakeholder engagement assessment matrix
- B.Requirements traceability matrix
- C.Probability and impact matrix
- D.Responsibility assignment matrix
- 查看答案