以下关于UML部署图的叙述中,正确的是( )。
- A.因为一条消息总是有某种响应,所以部署组件之间的依赖是双向的
- B.部署组件之间的依赖关系类似于包依赖
- C.部署图不用于描述代码的物理模块
- D.部署图不用于描述系统在不同计算机系统的物理分布
正确答案及解析
正确答案
解析
部署图展现了运行处理节点以及其中的构件的配置。部署图给出了体系结构的静态实施视图。它与构建视图相关,通产一个结点包含一个或多个构件。
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
-
- A.Artificial Intelligence
- B.Cloud Computing
- C.Internet of Things
- D.Big Data
- 查看答案
In project human resource management , ( )is not a source of power for the project manager.
-
- A.referent power
- B.expert power
- C.reward power
- D.audit power
- 查看答案
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
-
- A.detail feasibility analysis
- B.opportunity analysis
- C.economic feasibility analysis
- D.risk analysis
- 查看答案
( )is a grid that shows the project resources assigned to each work package.
-
- A.Stakeholder engagement assessment matrix
- B.Requirements traceability matrix
- C.Probability and impact matrix
- D.Responsibility assignment matrix
- 查看答案