题目详情

The project workbook is not so much a separate document as it is a structure imposed on the documents that the project will be producing anyway.
All the documents of the project need to be part of this(1).This includes objectives,external specifications,interface specifications,technical standards,internal specifications and administrative memoranda(备忘录).
Technical prose is almost immortal.If one examines the genealogy(手册)of a customer manual for a piece of hardware or software,one can trace not only the ideas,but also many of the very sentences and paragraphs back to the first(2)proposing the product or explaining the first design.For the technical writer,the paste-pot is as mighty as the pen.
Since this is so,and since tomorrow's product-quality manuals will grow from today’s memos,it is very important to get the structure of the documentation right.The early design of the project(3)ensures that the documentation structure itself is crafted,not haphazard.Moreover,the establishment of a structure molds later writing into segments that fit into that structure.
The second reason for the project workbook is control of the distribution of(4).The problem is not to restrict information,but to ensure that relevant information gets to all the people who need it.
The first step is to number all memoranda,so that ordered lists of titles are available and each worker can see if he has what he wants.The organization of the workbook goes well beyond this to establish a tree-structure of memoranda.The(5)allows distribution lists to be maintained by subtree,if that is desirable.
问题1选项
A.structure
B.specification
C.standard
D.objective
问题2选项
A.objective
B.memoranda
C.standard
D.specification
问题3选项
A.title
B.list
C.workbook
D.quality
问题4选项
A.product
B.manual
C.document
D.information
问题5选项
A.list
B.document
C.tree-structure
D.number

正确答案及解析

正确答案
ABCDC
解析
暂无解析

包含此试题的试卷

你可能感兴趣的试题

单选题

Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.

  • A.Artificial Intelligence
  • B.Cloud Computing
  • C.Internet of Things
  • D.Big Data
查看答案
单选题

In project human resource management , ( )is not a source of power for the project manager.

  • A.referent power
  • B.expert power
  • C.reward power
  • D.audit power
查看答案
单选题

At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.

  • A.detail feasibility analysis
  • B.opportunity analysis
  • C.economic feasibility analysis
  • D.risk analysis
查看答案
单选题

( )is a grid that shows the project resources assigned to each work package.

  • A.Stakeholder engagement assessment matrix
  • B.Requirements traceability matrix
  • C.Probability and impact matrix
  • D.Responsibility assignment matrix
查看答案
单选题

Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.

  • A.digital
  • B.networking
  • C.intelligentize
  • D.informatization
查看答案

相关题库更多 +