In the fields of physical security and information security,access control is the selective restriction of access to a place or other resource.The act of accessing may mean consuming,entering,or using.Permission to access a resource is called authorization(授权).
An access control mechanism(1)between a user(or a process executing on behalf of a user)and system resources,such as applications,operating systems,firewalls,routers,files,and databases.The system must first authenticate(验证)a user seeking access.Typically the authentication function determines whether the user is(2)to access the system at all.Then the access control function determines if the specific requested access by this user is permitted.A security administrator maintains an authorization database that specifies what type of access to which resources is allowed for this user.The access control function consults this database to determine whether to(3)access.An auditing function monitors and keeps a record of user accesses to system resources.
In practice,a number of(4)may cooperatively share the access control function.All operating systems have at least a rudimentary(基本的),and in many cases a quite robust,access control component.Add-on security packages can add to the(5)access control capabilities of the OS.Particular applications or utilities,such as a database management system,also incorporate access control functions.External devices,such as firewalls,can also provide access control services.
问题1选项
A.cooperates
B.coordinates
C.connects
D.mediates
问题2选项
A.denied
B.permitted
C.prohibited
D.rejected
问题3选项
A.open
B.monitor
C.grant
D.seek
问题4选项
A.components
B.users
C.mechanisms
D.algorithms
问题5选项
A.remote
B.native
C.controlled
D.automated
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
-
- A.Artificial Intelligence
- B.Cloud Computing
- C.Internet of Things
- D.Big Data
- 查看答案
In project human resource management , ( )is not a source of power for the project manager.
-
- A.referent power
- B.expert power
- C.reward power
- D.audit power
- 查看答案
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
-
- A.detail feasibility analysis
- B.opportunity analysis
- C.economic feasibility analysis
- D.risk analysis
- 查看答案
( )is a grid that shows the project resources assigned to each work package.
-
- A.Stakeholder engagement assessment matrix
- B.Requirements traceability matrix
- C.Probability and impact matrix
- D.Responsibility assignment matrix
- 查看答案
Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.
-
- A.digital
- B.networking
- C.intelligentize
- D.informatization
- 查看答案