题目详情

Ravi,like many project(  ),had studied the waterfall model of software development as the primary software life-cycle(  ).He was all set to use it for an upcoming project,his first assignment.However,Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages,something that implied that the system had to be delivered and built in(  )and not as(  ).
The situation in many other projects is not very different.The real world rarely presents a problem in which a standard process,or the process used in a previous project,is the best choice.To be the most suitable,an existing process must be(  )to the new problem.A development process,even after tailoring,generally cannot handle change requests.To accommodate change requests without losing control of the project,you must supplement the development process with a requirement change management process.
问题1选项
A.customers
B.managers
C.users
D.administrators
问题2选项
A.activity
B.procedure
C.process
D.progress
问题3选项
A.parts
B.modules
C.software
D.a whole
问题4选项
A.parts
B.modules
C.software
D.a whole
问题5选项
A.modified
B.used
C.suited
D.tailored

正确答案及解析

正确答案
BCADD
解析
暂无解析

包含此试题的试卷

你可能感兴趣的试题

单选题

Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.

  • A.Artificial Intelligence
  • B.Cloud Computing
  • C.Internet of Things
  • D.Big Data
查看答案
单选题

In project human resource management , ( )is not a source of power for the project manager.

  • A.referent power
  • B.expert power
  • C.reward power
  • D.audit power
查看答案
单选题

At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.

  • A.detail feasibility analysis
  • B.opportunity analysis
  • C.economic feasibility analysis
  • D.risk analysis
查看答案
单选题

( )is a grid that shows the project resources assigned to each work package.

  • A.Stakeholder engagement assessment matrix
  • B.Requirements traceability matrix
  • C.Probability and impact matrix
  • D.Responsibility assignment matrix
查看答案
单选题

Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.

  • A.digital
  • B.networking
  • C.intelligentize
  • D.informatization
查看答案

相关题库更多 +