For nearly ten years, the Unified Modeling Language (UML) has been the industry standard for visualizing, specifying, constructing, and documenting the( )of a software-intensive system.As the( )standard modeling language, the UML facilitates communication and reduces confusion among project ( ).The recent standardization of UML 2.0 has further extended the language’s scope and viability.Its inherent expressiveness allows users to( )everything from enterprise information systems and distributed Web-based applications to real-time embedded systems.
The UML is not limited to modeling software.In fact, it is expressive enough to model( )systems, such as workflow in the legal system, the structure and behavior of a patient healthcare system, software engineering in aircraft combat systems, and the design of hardware.
To understand the UML, you need to form a conceptual model of the language, and this requires learning three major elements: the UML’s basic building blocks, the rules that dictate how those building blocks may be put together, and some common mechanisms that apply throughout the UML.
问题1
A.classes
B.components
C.sequences
D.artifacts
问题2
A.real
B.legal
C.de facto
D.illegal
问题3
A.investors
B.developers
C.designers
D.stakeholders
问题4
A.model
B.code
C.test
D.modify
问题5
A.non-hardware
B.non-software
C.hardware
D.software
正确答案及解析
正确答案
解析
包含此试题的试卷
你可能感兴趣的试题
Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.
-
- A.Artificial Intelligence
- B.Cloud Computing
- C.Internet of Things
- D.Big Data
- 查看答案
In project human resource management , ( )is not a source of power for the project manager.
-
- A.referent power
- B.expert power
- C.reward power
- D.audit power
- 查看答案
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.
-
- A.detail feasibility analysis
- B.opportunity analysis
- C.economic feasibility analysis
- D.risk analysis
- 查看答案
( )is a grid that shows the project resources assigned to each work package.
-
- A.Stakeholder engagement assessment matrix
- B.Requirements traceability matrix
- C.Probability and impact matrix
- D.Responsibility assignment matrix
- 查看答案
Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.
-
- A.digital
- B.networking
- C.intelligentize
- D.informatization
- 查看答案