A requirement is simply a statement of what the system must do or what characteristics it needs to have.Requirements evolve from broad statements of overall(  )from the system to detailed statements of the business capabilities that a system should support to detailed technical statements of the way in which the capabilities will be implemented in the new system.(  )focus on describing how to create the software product that will be produced from the project Nonfunctional requirements are primarily used in the design phase when decisions are made about the user interface,the hardware and software,and the system's underlying architecture.The system's physical and technical environments would be considered(  ).The speed,capacity,and reliability of the system belong to(  ).(  )describes that who has authorized access to the system under what circumstances.
问题1选项
A.business needs
B.operation processes
C.technical specification
D.function components
问题2选项
A.User requirements
B.Business requirements
C.Function requirements
D.System requirements
问题3选项
A.a functional requirement
B.a technical requirement
C.an operational requirement
D.a service requirement
问题4选项
A.security requirement
B.performance requirement
C.technical requirement
D.information requirement
问题5选项
A.System constraint
B.Cultural requirement
C.Control requirement
D.Security requirement

正确答案及解析

正确答案
ADCBD
解析
暂无解析

包含此试题的试卷

你可能感兴趣的试题

单选题

Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.

  • A.Artificial Intelligence
  • B.Cloud Computing
  • C.Internet of Things
  • D.Big Data
查看答案
单选题

In project human resource management , ( )is not a source of power for the project manager.

  • A.referent power
  • B.expert power
  • C.reward power
  • D.audit power
查看答案
单选题

At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.

  • A.detail feasibility analysis
  • B.opportunity analysis
  • C.economic feasibility analysis
  • D.risk analysis
查看答案
单选题

( )is a grid that shows the project resources assigned to each work package.

  • A.Stakeholder engagement assessment matrix
  • B.Requirements traceability matrix
  • C.Probability and impact matrix
  • D.Responsibility assignment matrix
查看答案
单选题

Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.

  • A.digital
  • B.networking
  • C.intelligentize
  • D.informatization